DeVeth Drilling

CONSTRUCTION OF AN INDUSTRIAL WORKSHOP WITH ATTACHED OFFICES

Newlands Group was contracted for the construction of an industrial workshop. The scope of works involved a steel and tilt panel workshop, covered loading area and concreted driveways either side of the building. The building was also equipped with an under floor heating system and irrigated landscaping across the front and side of the property.

Address Rielly Street, Torrington
Client DeVeth Drilling
Sector
  • Industrial
  • Retail and Office
Services
  • Engineering and Surveying
  • Structural Concreting
  • Bulk and General Earthworks
  • Plumbing, Drainage and Pipelines
  • Industrial Construction
Key Personnel
  • Bevan Austin
  • Gary Briscoe
Contract Value $1m – $1.5m
Project Length 3 Months