DeVeth Drilling
CONSTRUCTION OF AN INDUSTRIAL WORKSHOP WITH ATTACHED OFFICES
Newlands Group was contracted for the construction of an industrial workshop. The scope of works involved a steel and tilt panel workshop, covered loading area and concreted driveways either side of the building. The building was also equipped with an under floor heating system and irrigated landscaping across the front and side of the property.
Address | Rielly Street, Torrington |
Client | DeVeth Drilling |
Sector |
|
Services |
|
Key Personnel |
|
Contract Value | $1m – $1.5m |
Project Length | 3 Months |

