24 October 2016
Nexus Projects
Newlands Group has been contracted by Nexus Infrastructure to complete four projects as part of the construction of the Toowoomba Second Range Crossing, a $1.6 billion road bypass connecting the Gore Highway at Athol in the West to the Warrego Highway at Helidon in the east, via Charlton.
Client/Customer: Nexus Infrastructure
Job Type: Civil
Sector: Private Sector
1. Bedford Street Tip Demolition
Newlands Group was contracted for the demolition and removal of an existing waste management facility, with the scope of works including capping all existing services to 500mm below ground level and removal and disposal of infrastructure, signage and associated posts, bollards, wheel stops and concrete slabs.
Address: Bedford Street, Toowoomba, Qld
Services:
- Demolition
Key Personnel:
- Jason Edge
- Noel Frizzell
Contract Value: > $500,000
Contract Length: > 1 Month
2. Temporary Sewer Diversion
Newlands Group was contracted to install a temporary sewer diversion and associated works to accommodate major earthworks, with the scope of works including the supply, installation and commissioning of a sewer pump station, rising main, gravity main and emergency overflow holding tanks, including live sewer connections.
Address: New England Highway, Qld
Services:
- Plumbing, Drainage & Pipelines
- Utility Service Location
Key Personnel:
- Jason Edge
- Noel Frizzell
Contract Value: > $500,000
Contract Length: > 1 Month
3. Water Mains Installation & Relocation
Newlands Group was contracted to install new water main services and decommission existing water main services, with the scope of works including the installation of all scour valves, air valves, fire hydrants and associated infrastructure, and the decommission and grout to Mort Street Sewer and Access Road.
Address: 139-143 Hermitage Rd, Cranley, Qld
Services:
- Plumbing, Drainage & Pipelines
Key Personnel:
- Jason Edge
- Noel Frizzell
Contract Value: $750,000 - $1,000,000
Contract Length: > 3 Months
4. West Civil Works – Access Gates
Newlands Group was contracted for the construction of site access gates at various locations, with the scope of works including stripping of topsoil, earthworks, ground surface treatment, pavement construction, installation of rumble grids, culvert crossings and ancillary works.
Address: Various sites in the Western Section of the Toowoomba Second Range Crossing, Qld
Services:
- Engineering & Surveying
- Road & Pavement Construction
- Bulk & General Earthworks
Key Personnel:
- Jason Edge
- Andrew Atkinson
- Noel Frizzell
Contract Value: > $500,000
Contract Length: > 2 Months